PE services |
Project |
Date |
|
QP Structural for 50 nos POB & Ramp Linkway (LTA) |
Contract ER247 (Est. Project cost = $1.6M) |
Oct 2007 |
|
QP Structural for POB Linkway & Ramp (LTA) near Whampoa Drive Blk 75 & 95 |
Contract ER305 (Est.Project cost = $1.2M) |
Jan
2009 |
|
QP Structural for POB, covered Linkway & Ramp (LTA) |
Contract ER373 (Est. Project cost = $1.6M) |
May 2011 |
|
QP Structural for proposed lifts to existing POB near MRT station and covered linkway. |
C1342A (Est. Project cost = $1.6M) |
May
2012 |
|
Temporary works and Geotechnical design. |
NSLE C156 |
Jun
2010 |
|
Temporary works and Geotechnical design. |
Marina Coastal Expressway C482 |
Jul
2010 |
|
Temporary works and Geotechnical design. |
C913 |
Sep
2010 |
|
Temporary works and Geotechnical design. |
Downtown Line C921 |
Nov 2010 |
|
Temporary works and Geotechnical design. |
C930 |
Jan 2012 |
|
Temporary works and Geotechnical design. |
C933 |
Sep 2012 |
|
Temporary works and Geotechnical design. |
C923 |
Nov 2011 |
|
Temporary works and Geotechnical design. |
C937 |
Dec 2011 |
|
Temporary works and Geotechnical design. |
NS1 & NS2 |
Dec 2012 |
|
Temporary works and Geotechnical design. |
Powergrid Transmission cable Tunnels Contract EW2 project |
Dec 2012 |
|